The Khorramabad Water Transfer System is one of the most complex and large-scale infrastructure projects in regional water supply. Designed to ensure safe, high-volume water delivery, it plays a vital role in supporting sustainable water access across target zones.
Project value:
8.625.878
$
$8.625.878
Project value:
Safety & Quality Control
All phases were executed under strict international safety standards and continuous quality monitoring. From geotechnical assessments to material testing, the system was built for long-term durability and flawless performance.
Construction Technology & Professional Execution
The project combines mechanized tunneling, precision pipe-laying, and industrial-grade concrete channeling. The 7.3-meter water tunnel and 5-meter-wide outlet ensure optimal flow capacity. The concrete channel, with a 15 m³/s throughput, supports high-efficiency water transfer under operational conditions.
Khara Dezh’s Role
Khara Dezh led the full scope of design, execution, and supervision. With expert teams, advanced equipment, and integrated engineering management, the company delivered a benchmark project in water infrastructure.
Key Outcomes
Reliable water supply for target regions
High-capacity water transfer with minimal loss
Upgraded regional water infrastructure
Safe execution across diverse geological conditions
Technical Specifications
Two steel pipelines, 1.800 mm diameter, 7 km length
Two GRP pipelines, 1.800 mm diameter
Tunnel outlet: 200 meters long, 5 meters wide
Water tunnel: finished diameter 7.3 meters, approx. 5.220 meters long
Concrete transfer channel: 15 m³/s capacity, 6.587 meters long
These specifications reflect the engineering complexity and demand for precision and safety in execution.